SRB Project Newsletter Issue 14 — June 2026

Susquehanna River Bridge Project Newsletter Issue #14 – June 2026 Read the Full Newsletter Here Home The Susquehanna River Bridge Project is continuing to progress, with wildlife protection and surveying work having started this summer. Recent Progress Surveying: Crews will conduct preliminary land surveys (e.g. topological, environmental, archaeological, etc.) in Summer 2026. Surveying will take […]
Amtrak Completes Archaeological Excavations for Susquehanna River Bridge Project

The team recovered over 15,000 artifacts during the dig left from past occupants that gave insight into the types of plates they used, what they drank, and how they built their homes.
Amtrak Begins Archaeological Fieldwork for Susquehanna River Bridge Project

With “America250” fast approaching – a celebration of 250 years since the signing of the Declaration of Independence – this work is an important opportunity to reflect on our nation’s past, honor the contributions of Americans, and look toward the future.