B&P Tunnel Replacement Program
Reports & Documents
- Overall Program Fact Sheet
- Community Investment Program Fact Sheet
- “First Look at the New West Baltimore MARC Station” Flyer
- FAQ 2024
- Archaeology Fact Sheet
- Subsurface Acquisition Guide
- Guía de Adquisición de Subsuelo para Propietarios
- Demolition Fact Sheet
- Salvage from Historic Buildings Fact Sheet
- Pre-Construction Inspections Fact Sheet
The Federal Railroad Administration has issued a Record of Decision (ROD) for the B&P Tunnel Project. In making its decision, FRA considered the information and analysis included in the Draft and Final Environmental Impact Statements (DEIS & FEIS) for the project and public and agency comments.
FRA has prepared this ROD in compliance with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. § 4321 et seq.), the Council of Environmental Quality (CEQ) NEPA Regulations (40 C.F.R. Parts 1500-1508), the FRA Procedures for Considering Environmental Impacts (64 Federal Register 28545 [May 26, 1999]), and FRA’s Update to NEPA Implementing Procedures (78 Federal Register Part 2713 [January 14, 2013]).
- Appendix A – Environmental Resource Mapping
- Appendix B – Agency Correspondence
- Appendix C – List of Project Technical Reports and Documents
- Appendix D – Table of Minority Race and/or Ethnicity
- Appendix E – Socioeconomic Data Tables
- Appendix F – List of Permits
- Appendix G – List of Authorizing Laws and Regulations
- Appendix H – Programmatic Agreement
- Appendix I – DEIS Comments and Responses
- Appendix J – Plan and Profile Drawings
- B&P Tunnel Project Air Quality Technical Report
- B&P Tunnel Project Architectural Historic Properties Effects Assessment Report
- B&P Tunnel Project Architectural Historic Properties Survey
- B&P Tunnel Project Hazardous Materials Assessment
- B&P Tunnel Project Noise & Air Quality Technical Memorandum for Ventilation Plants
- B&P Tunnel Project Noise Technical Report
- B&P Tunnel Project Phase 1A Archeological Study
- B&P Tunnel Project Vibration Technical Report
- B&P Tunnel Project Prelminary Alternatives Screening Report
- B&P Tunnel Project Alternatives Report
- B&P Tunnel Section 106 Technical Updates Memo
- B&P Tunnel Natural Resources Technical Report – Part 1
- B&P Tunnel Natural Resources Technical Report – Part 2
- B&P Tunnel Natural Resources Technical Report – Part 3
Stay in Touch
For additional information, email bptunnel@amtrak.com or call (443) 423-1115 to speak to a member of the program team.